
Better economic value
Boosting productivity
-
7-15% of the total cost of the building is cost of architects in design phase
-
Before the construction is completed, need to optimize the process
-
3 main drivers:
-
Efficiency at the design stage of the building: bringing solutions, services and documents to ease the work of the different stakeholders in the conception of a new building
-
Efficiency of the construction process: enable quicker completion of the construction, by better management on site, conformity with standards and technical approval, ...
-
Optimized cost of installation: reduced installation time, less accessories, solutions easier to install and to adapt to real jobsite configuration, ...
-
Improving cost of ownership
-
3 main drivers:
-
Optimize operating cost: limit the impact of external negative incidents by increasing protection and early detection of events, design builsings easy to repair, use easy-to-maintain solutions, ..
-
Efficiency at the end-of-life of the building: optimize demolition and deconstruction, enable re-use of building parts, minimize landfill and other disposal costs
-
Increased value of property: from the design stage, favor durable construction with low energy consumption, low maintenance and easy renovation
-
How we contribute
Saint-Gobain solutions are available to take action at all lifecycle stages:
-
Design stage: tools and documents to support designers, BIM objects
-
Construction stage: lightweight construction systems, off-site manufacturing, logistics services
-
Operating stage: safe solutions, easy to maintain, long-lasting solutions
-
End-of-life: solutions easy to deconstruct, dismount or recycle ; recycling services